Job Stages 🔄
The Amplifi-Qx Hub uses a stage-based progression system to ensure consistent quality and process adherence across all job types. Each type of job follows its own carefully designed stage sequence.
Installation Job Stages 🏗️
1. NEW INSTALL
Initial stage for all installation jobs created through the sales process.
Financial Setup 💰
- Expected invoice confirmation
- Payment terms verification
Survey Planning 📋
- Pre-install survey scheduling
- Site access arrangements
- Special requirements documentation
- Risk assessment planning
Technical Documentation 📐
- Floorplan status and requirements
- Proposed Amplifi-Qx solution details
- Network Unit (NU) count verification
- Coverage Unit (CU) count confirmation
Site Details 📍
- Built-up area classification
- External signal strength readings
- Location type (rural/urban)
- Access considerations
- Parking arrangements
- Critical coverage areas
- Handover specifications
2. SCHEDULING REQUIRED 📅
Stage focused on installation logistics planning.
Timeline Planning
- Installation start date confirmation
- Duration estimation
- Resource availability check
- Customer schedule alignment
Resource Management
- Engineer assignment
- Equipment allocation
- Vehicle scheduling
- Tool requirements
3. SCHEDULED NOW PREP ⚙️
Comprehensive pre-installation preparation phase.
Inventory Management
- Stock availability verification
- Equipment allocation
- Tool preparation
- Vehicle loading plan
Documentation
- Floorplan verification
- Risk assessment completion
- Method statement review
- Insurance certification
- International work permits (if required)
Logistics
- Transport arrangements
- Accommodation booking
- Parking confirmation
- Access coordination
4. PREPPED AWAITING INSTALL 🔍
Final verification stage before installation begins.
Pre-Installation Checks
- Installation commencement confirmation
- RAMS document verification
- PPE requirements confirmation
- Safety Data Sheet review
- Team briefing completion
- Client communication verification
5. INSTALLATION ACTIVE 🛠️
Active on-site installation tracking.
Daily Updates
- Work completed
- Issues encountered
- Resources used
- Time tracking
Documentation
- Progress photos
- Technical notes
- Client communications
- Issue resolution
Quality Control
- Installation standards verification
- Testing procedures
- Performance validation
- Client feedback collection
6. INSTALLED AWAITING SIGN-OFF ✅
Post-installation quality assurance phase.
System Verification
- Performance testing results
- Coverage validation
- Network unit functionality
- System integration checks
Documentation Review
- Installation records
- Test results
- Client training completion
- Handover documentation
Financial Review
- Cost confirmation
- Profit verification
- Invoice preparation
- Payment scheduling
7. POST INSTALL TASKS 📋
Final administrative and documentation phase.
Maintenance Planning
- Agreement setup
- Schedule creation
- Response time confirmation
- Support contact setup
Documentation Finalisation
- As-built drawings
- System documentation
- User guides
- Warranty information
8. ARCHIVED INSTALL 📁
Final stage for completed installations.
Archiving Requirements
- All documentation complete
- Financial closure confirmed
- Client sign-off received
- Maintenance agreement activated
- Warranty registration completed
Site Survey Job Stages 📐
1. NEW SURVEY
Initial survey setup stage.
Required Information
- Survey scheduling status
- Confirmed survey date
- Expected invoice details
- Floorplan requirements
- Primary contact details
- Site characteristics documentation
2. SCHEDULING REQUIRED
Survey visit planning phase.
3. SURVEY SCHEDULED
Pre-survey preparation stage.
4. SURVEY COMPLETE
Documentation and analysis phase.
5. COMPLETE AWAITING SIGN-OFF
Quality control and verification stage.
6. ARCHIVED SURVEY
Final archived status.
Maintenance Visit Stages 🔧
1. NEW MAINTENANCE VISIT
Initial visit setup phase.
Required Information
- Maintenance agreement verification
- Access requirements documentation
- Authorization confirmation
- Primary contact details
- System information review
2. SCHEDULING REQUIRED
Visit planning and coordination.
3. SITE VISIT COMPLETE
Post-visit documentation phase.
4. ARCHIVED MAINTENANCE VISIT
Final archived status.
Stage Management Best Practices 💡
Progress Tracking
- Update stages promptly
- Complete all required fields
- Document decision reasoning
- Maintain clear communication
- Follow standard procedures
Quality Control
- Verify all requirements
- Document completion evidence
- Obtain necessary approvals
- Track outstanding items
- Maintain audit trail
Each stage has specific requirements that must be met before progression. Always verify completion of all requirements before moving to the next stage.